The GIP has the following responsibilities:
- Preparation of data for concluding contracts with the customer, drawing up a schedule for the development of design and estimate documentation
- Participation in the formation of a team of project developers; coordination of design and survey work throughout the project complex
- Ensuring the issuance of the design and estimate documentation package to the customer in accordance with the calendar plan
Ganiev Donier Bakhtierovich
GUI
Work phone: 78-140-67-06
GUI assigned objects:
Association of Banks of Uzbekistan. DP Moliya Binokor Xizmat
JSC Thermal Power Plants
JSC Navoi TPP
JSC Syrdarya TPP
JSC Tashkent TPP
FIR Using Engineering (Development of working documentation for the phased modernization of six power units No. 3, No. 4, No. 5, No. 6, No. 9 and No. 10 of Syrdarya TPP JSC)
LLC “TUTLY SOLAR” (provision of services for adaptation, development of documentation, author’s supervision of the solar power plant project in the Samarkand region with a total capacity of 100 MW)
Davletov Rustam Karimbayevich
GUI
Work phone: 78-140-67-21
GUI assigned objects:
JSC Tahiyatosh IES
AO Yangi -Angren IES
AO Angren IES
AO Farg’ona I EM
JSC Turakurgan TPP
JSC Tashkent CHP
Aziz Nurmatov
GUI
Work phone: 78-140-67-13
GUI assigned objects:
JSC Talimarjan TPP
JSC National Electric Networks of Uzbekistan (R.D. “Modernization and reconstruction of substations of main networks”. 1 phase. Substation 220Kv “Yuksak”
SUE under the Ministry of Housing and Communal Services of the Republic of Uzbekistan.
JSC Muborak IEM
Sergey Zavadsky
GUI
Work phone: 78-140-67-26
GUI assigned objects:
SUE under the Ministry of Housing and Communal Services of the Republic of Uzbekistan.
JSC Muborak IEM
Karimbekov Aziz Rakhmatovich
GUI
Work phone: 78-140-67-03
GUI assigned objects:
JSC National Electric Networks of Uzbekistan (RP “Construction of overhead line 220, 31 km long with the construction of 220/110/35 kV Akhangaran substation, with a capacity of 2×250 MVA on the territory of Angren SEZ in the Tashkent region”)
JSC “Almalyk MMC” (Development of the RP “Reconstruction of the incremental tailing dump No. 2 of the Angren gold processing plant. Stage II for 10 years”)